Transmission Substation
We provide all EPC contract services. Our experience allows us to provide the list of services. They are:
- Geodetic works
- Design of objects
- Supply of construction works
- General construction works
- Construct of oil and gas objects
- Cable mounting up to 220 kV and over (if necessary)
- High tension lines construction up to 220 kV and over (if necessary)
- Electric substations construction up to 330 kV and over (if necessary)
- Electric transformers service works up to 500 kV and over (if necessary)
Staff
Total number of staff working are 1073 people which are listed below:
- Managers — 10
- Office workers — 20
- Engineers — 310
- Workers — 733
Machinery and equipment
Total amount is 210 pcs.
- Machinery and mechanisms for excavation, spade-work and etc — 36 pcs
- Load-lifting machinery (cranes and etc) — 17 pcs
- General work machinery (trucs and etc) — 107 pcs
- Special machinery for high tension poles erection — 11 pcs
SOME OF OUR IMPLEMENTED PROJECTS
TRANSMISSION LINE & PULL
- Support electric transmission line 10 kV, 63 km
- Electric transmission line 110 kV, Yakutia republic-27,4 km
- Transmission lines 10 kV and 35 kV, power support of Verhnechenskoe oil and gas field
- Electric transmission line 110 kV, «Bystrinskaya and Bugdainskaya»,
- Electric transmission line 110 kV, «Mamakan Muskavit», Irkutsk
- Transmission line 110 kV, Angarsk, Irkutsk region
- Transmission line 220 kV, Yaraktinskoe oil and gas field
Electrical Substation
- Electric substation 110 kV «Peleduy», Yakutia republic,
- Transformer Substation 38
- Power control boards MCC-MCC-TPSB (Temporary Power Supply Board) based on the PROTON low voltage distribution switchboard, Schneider Electric equipment, Power transformer 630 kva (2pcs , fire equipment panels(2pcs.)
- Transformer Substation 38
- Power control boards MCC-MCC-TPSB (Temporary Power Supply Board) based on the PROTON low voltage distribution switchboard, Schneider Electric equipment, Power transformer 630 kva (2pcs , fire equipment panels(2pcs.)
- Transformer substation 2TTS (twotransformer substation) 4,000 kVA for
- Nurkazgan Mining Complex, including: power transformers S.E.A. 4,000 kVA, busbars BBI 6,300 A IP55, switchgears 2×6,300 A, 2×4,000 A, 2×2,500 A. Mitsubishi Electric equipment.
- Transformer substation 2TTS (twotransformer substation)-630kVA including: dry-type enclosed power transformers TSZ 6З0 kVA, PROTON low voltage distribution switchboard 2×1,600 А 3b, 1,600 A busbar bridges, Schneider Electric equipment.
- Production and supply of a transformer substation 2PTTS-1,000/6/0.4 and a set of switchboard equipment based on the PROTON low voltage distribution switchboard 2×2,000 A, a cabinet with an ACS controller based on an AC500 ABB controller, power-factor correction unit 2×400 kVar with 2,000 A busbar bridges, power transformers 1,000/6/0.4kV IP31 (S.E.A, Italy)
- Production and supply of a transformer substation PTS-630/6/0.4 including: Low voltage switchgear 0.4 kV 1×1,600 A based on the PROTON low voltage distribution switchboard, power transformer GDNN 6/0.4-630 IP21 with copper windings, 6 kV high voltage switchgear based on ONEGA single-end service assembled chamber.